Sign In | Join Free | My frbiz.com |
|
Place of Origin : Wuhan Hubei China
Brand Name : Huaying
Certification : ISO
Model Number : Huaying Series
MOQ : 1 Set
Price : negotionable
Packaging Details : Wooden Case
Delivery Time : 7 Working Days
Payment Terms : T/T L/C
Supply Ability : 200 sets per month
Warranty : 1 year free and lifelong maintenance
Feature 1 : The auto transformer adjustable
Feature 2 : LED indication
Feature 3 : button operation
Feature 4 : the desk Installed by separated structures, easy to move
Name : Primary Current Injection Test Set
Auto Transformer Adjustable Primary Current Injection Test Kit For Circuit Breaker Measurement
1. Product Name:
Primary Current Injection Test System SLQ
2. Equipment Description:
SLQ primary injection test set is a high current generator instrument. It is applied in current transformer test , circuit breaker test and so on. Adjustable output current, smooth in current rise, large scope of load variation, easy and safe operation.
3.Technical Parameters:
Type |
Capacity (kva) |
Power supply |
Output |
Impedance voltage % |
Idle current % |
mode |
||
I (A) |
V (V) |
I (A) |
V (V) |
|||||
SLQ-5/500 |
3 |
13.6 |
220 |
500 |
5 |
>8 |
>6 |
single |
SLQ -5/1000 |
5 |
22.7 |
220 |
1000 |
5 |
>8 |
>6 |
single |
SLQ -10/2000 |
10 |
46 |
220 |
2000 |
5 |
>8 |
>6 |
Separated |
SLQ -12/4000 |
12 |
30 |
400 |
2000/4000 |
6/3 |
>8 |
>6 |
Separated |
SLQ -15/5000 |
15 |
37.5 |
400 |
2500/5000 |
6/3 |
>8 |
>6 |
Separated |
SLQ -150/25kA |
150 |
375 |
400 |
25000 |
6 |
>8 |
>6 |
Separated |
Environment temperature: 0~50°C
Humidity: ≤85%RH
4. Safety Warning:
1) The test set must be connected to earth reliably before use
2) The output terminals should be clean before switching on
3) The test set should be in power off before make connections for the test
4) After the high current output the metal terminals are very hot. It is forbid to touch those parts
5) It is forbid to touch the terminals or high current circuit when test set is switched to ON position
6) The duty cycle should not be exceeded
7) Any replacement should be made when test set is switched off
8) The test set should never be connected to the live power line
![]() |
Auto Transformer Adjustable Primary Current Injection Test Kit For Circuit Breaker Measurement Images |